logo-home

Charlene's Scholastic Emporium.

Your Actual and Virtual Exam Tests Excellent Tutor.

Bijlesdocent EmilyCharlene helpt jou met studeren door samenvattingen te schrijven van studiemateriaal

EmilyCharlene helpt met

Meer zien

Community

  • Volgers
  • Volgend

15 Ontvangen beoordelingen

10 items

ACI- Concrete Field-Testing Technician - Grade 1 Exam Q’s & A’s 2024

(0)
$14.49
0x  verkocht

ACI- Concrete Field-Testing Technician - Grade 1 Exam Q’s & A’s 2024 Q1. Start molding specimens for strength tests within 30 minutes after fabricating the composite sample. A. True B. False -Answer-B. False ASTM C172 -Para (4.1.2) - Start molding. specimens for strength tests within 15 min after fabricating the composite sample. Q2. The maximum allowable time between obtaining the first and last portions of the composite sample may not exceed 5 minutes. A. True B. False -Answer-...

i x
  • Tentamen (uitwerkingen)
  •  • 52 pagina's • 
  • door EmilyCharlene • 
  • geupload  14-02-2024
Snel bekijken
i x

ACI Grade 1 - Written Test 2024 with Complete Solutions

(0)
$13.49
0x  verkocht

ACI Grade 1 - Written Test 2024 with Complete Solutions Sampling by this practice covers procedures for obtaining representative samples, on which tests are to be performed to determine ___ with quality requirements of the specifications listed under which the concrete is furnished (C172/C172M-17 = Sampling Freshly Mixed Concrete) -Answer-Compliance This practice covers sampling from five types of equipment which are... (C172/C172M- 17 = Sampling Freshly Mixed Concrete) -Answer-Stationary...

i x
  • Tentamen (uitwerkingen)
  •  • 31 pagina's • 
  • door EmilyCharlene • 
  • geupload  14-02-2024
Snel bekijken
i x

ACI Grade 1 Field Testing Certification Practice Test - 2024

(0)
$12.49
0x  verkocht

ACI Grade 1 Field Testing Certification Practice Test - 2024 For concrete with aggregates less than 3 inches, the thermometer must remain in the fresh concrete sample a minimum of 5 minutes or until the temperature reading stabilizes. (T or F) -Answer-False (2-5 minutes) The temperature measuring device must be accurate to within 0.1 degree. (T or F) - Answer- The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete throughout a range of _...

i x
  • Tentamen (uitwerkingen)
  •  • 10 pagina's • 
  • door EmilyCharlene • 
  • geupload  14-02-2024
Snel bekijken
i x

ACI Field Grade 1 Practice Test 2024 with 100% Complete Solutions

(0)
$11.49
0x  verkocht

ACI Field Grade 1 Practice Test 2024 with 100% Complete Solutions The temperature measuring device shall be cable of accurately measuring the temperature of freshly mixed concrete to 1°F throught a range of____________________________. -Answer-30 - 120°F It is acceptable to measure the temperature of freshly mixed concrete in the forms provided? -Answer-The sensor of the temperature measuring device has at least 3 in. of cover in all directions. Composite samples are required even if t...

i x
  • Tentamen (uitwerkingen)
  •  • 6 pagina's • 
  • door EmilyCharlene • 
  • geupload  14-02-2024
Snel bekijken
i x

ACI Certification- Concrete Field Testing Technician Grade 1 CP-1 (12) Questions and Answers 2024

(0)
$12.49
0x  verkocht

ACI Certification- Concrete Field Testing Technician Grade 1 CP-1 (12) Questions and Answers 2024 ASTM C1064 -Answer-Standard Test Method For Temperature of Freshly Mixed Hydraulic-Cement Concrete The sensor of the temperature measuring device shall be submerged a minimum of ______ inches into the freshly mixed concrete. -Answer-3" The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete to ± ______ °F throughout a range of ____________....

i x
  • Tentamen (uitwerkingen)
  •  • 18 pagina's • 
  • door EmilyCharlene • 
  • geupload  14-02-2024
Snel bekijken
i x

ACI Written Exam Questions and Answers 2024

(0)
$12.49
0x  verkocht

ACI Written Exam Questions and Answers 2024 The sensor of the temperature measureing device shall be submerged a minimum of ____ in - Answer-3 (75mm) The temperature measureing device shall have a capacity of measuring temperature of freshly mixed conrcrete to +-_____ degrees F throught a range of _____ - Answer-1(.5 degrees C), 30-120 (0-50 degrees C) The temperature measuring device shall be calibrated____, or whenever there is a question of _____ - Answer-annually, accuracy The temp o...

i x
  •  Voordeelbundel
  • Tentamen (uitwerkingen)
  •  • 12 pagina's • 
  • door EmilyCharlene • 
  • geupload  14-02-2024
Snel bekijken
i x

ACI Test- 100% Correctly Answered 2024

(0)
$12.49
0x  verkocht

ACI Test- 100% Correctly Answered 2024 The total time allowed between obtaining the first and final portions of a composite sample is -Answer-15 minutes When it is necessary to wet sieve the concrete sample, wet sieving should be performed after the individual samples are remixed into a composite sample (T or F) - Answer-F Tests for slump, temperature, and air content must begin within ______ minutes after obtaining the composite sample -Answer-5 minutes Begin molding test specimens with...

i x
  •  Voordeelbundel
  • Tentamen (uitwerkingen)
  •  • 8 pagina's • 
  • door EmilyCharlene • 
  • geupload  14-02-2024
Snel bekijken
i x

ACI Grade 1 Field Testing Certification Practice Test – 100% Solved

(0)
$12.49
0x  verkocht

ACI Grade 1 Field Testing Certification Practice Test – 100% Solved For concrete with aggregates less than 3 inches, the thermometer must remain in the fresh concrete sample a minimum of 5 minutes or until the temperature reading stabilizes. (T or F) -Answer-False (2-5 minutes) The temperature measuring device must be accurate to within 0.1 degree. (T or F) - Answer- The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete throughout a r...

i x
  •  Voordeelbundel
  • Tentamen (uitwerkingen)
  •  • 10 pagina's • 
  • door EmilyCharlene • 
  • geupload  14-02-2024
Snel bekijken
i x

ACI Field Grade 1 Practice Test 2024

(0)
$12.49
0x  verkocht

ACI Field Grade 1 Practice Test 2024 The temperature measuring device shall be cable of accurately measuring the temperature of freshly mixed concrete to 1°F throught a range of____________________________. -Answer-30 - 120°F It is acceptable to measure the temperature of freshly mixed concrete in the forms provided? -Answer-The sensor of the temperature measuring device has at least 3 in. of cover in all directions. Composite samples are required even if the only purpose for obtaining ...

i x
  •  Voordeelbundel
  • Tentamen (uitwerkingen)
  •  • 6 pagina's • 
  • door EmilyCharlene • 
  • geupload  14-02-2024
Snel bekijken
i x

ACI written exam questions with answers 2024

(0)
$10.49
0x  verkocht

ACI written exam questions with answers 2024 False. Relatively dense -Answer-The method of determining air content of concrete containing lightweight aggregate is the pressure method True -Answer-Is the following statement true or false? When making a test cylinder from concrete being used in construction, the field technician must also measure the slump of the concrete. Disregard the test and retest on another portion of the sample. -Answer-While the technician is checking the slump of t...

i x
  •  Voordeelbundel
  • Tentamen (uitwerkingen)
  •  • 3 pagina's • 
  • door EmilyCharlene • 
  • geupload  14-02-2024
Snel bekijken
i x