Bus660 homework Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Bus660 homework? On this page you'll find 21 study documents about Bus660 homework.

All 21 results

Sort by

BUS 660 Topic 3 Introduction to Linear Programming - Homework
  • BUS 660 Topic 3 Introduction to Linear Programming - Homework

  • Other • 19 pages • 2023
  • Available in package deal
  • Problem 8-25(Algorithmic) GeorgiaCabinetsmanufactureskitchencabinetsthataresoldtolocaldealersthroughouttheSoutheast.Becauseofalargebacklogofordersfor oakand cherrycabinets,the company decidedto contract with threesmaller cabinetmakersto do the final finishing operation. For thethree cabinetmakers, the number of hours required to complete all the oak cabinets, the number of hours required to complete all the cherrycabinets,thenumberofhoursavailableforthefinalfinishingoperation,andthecostperhour...
    (0)
  • $21.99
  • + learn more
BUS 660 Topic 5 Linear Programming Distribution and Network Models - Homework
  • BUS 660 Topic 5 Linear Programming Distribution and Network Models - Homework

  • Other • 20 pages • 2023
  • Available in package deal
  • Problem 10-05: Premier Consulting’s two consultants, Avery and Baker, can be scheduled to work for clients up to a maximum of 160 hours each over the next four weeks. A third consultant, Campbell, has some administrative assignments already planned and is available for clients up to a maximum of 140 hours over the next four weeks. The company has four clients with projects in process. The estimated hourly requirements for each of the clients over the four-week period are as follows: Hourly ra...
    (0)
  • $21.99
  • + learn more
BUS 660 Topic 7 Waiting Line Models - Homework
  • BUS 660 Topic 7 Waiting Line Models - Homework

  • Other • 19 pages • 2023
  • Available in package deal
  • 1. Problem 15-27 (Algorithmic): Gubser Welding, Inc., operates a welding service for construction and automotive repair jobs. Assume that the arrival of jobs at the company's office can be described by a Poisson probability distribution with an arrival rate of three jobs per 8-hour day. The time required to complete the jobs follows a normal probability distribution, with a mean time of 2.2 hours and a standard deviation of 1 hour. Answer the following questions, assuming that Gubser uses one w...
    (0)
  • $21.99
  • + learn more
BUS 660 Topic 8 Simulation - Homework
  • BUS 660 Topic 8 Simulation - Homework

  • Other • 5 pages • 2023
  • Available in package deal
  • BUS 660 Topic 8 Simulation - Homework
    (0)
  • $11.49
  • 1x sold
  • + learn more
BUS 660 Topic 1 Decision Analysis - Homework
  • BUS 660 Topic 1 Decision Analysis - Homework

  • Other • 10 pages • 2023
  • Available in package deal
  • Problem4-25: TheGormanManufacturingCompanymustdecidewhethertomanufactureacomponentpartatitsMilan, Michigan, plant or purchase the component part from a supplier. The resulting profit isdependentuponthedemandfortheproduct.Thefollowingpayofftableshowstheprojectedprofit(inthousandsofdollars): Thestate-of-natureprobabilitiesareP(s1)=0.35,P(s2)=0.35,andP(s3)=0.30. a. Useadecisiontreetorecommendadecision. b. UseEVPItodeterminewhetherGormanshouldattempttoobtainabetterestimateofdemand. c. A test mar...
    (0)
  • $21.49
  • + learn more
BUS 660 Topic 2 Time Series Analysis and Forecasting - Homework
  • BUS 660 Topic 2 Time Series Analysis and Forecasting - Homework

  • Other • 9 pages • 2023
  • Available in package deal
  • Problem 6-09: With the gasoline time series data from the given table, show the exponential smoothing forecasts using a = 0.1. a. Applying the MSE measure of forecast accuracy, would you prefer a smoothing constant of a = 0.1 or a = 0.2 for the gasoline sales time series? Do not round your interim computations and round your final answers to three decimal places. b. Are the results the same if you app y MAE as the measure of accuracy? Do not round your interim computations and round your fina...
    (0)
  • $21.99
  • + learn more
BUS 660 Topic 8 Simulation - Homework
  • BUS 660 Topic 8 Simulation - Homework

  • Other • 5 pages • 2023
  • Available in package deal
  • Problem 16-03:Grear Tire Company has produced a new tire with an estimated mean lifetime mileage of 36,500 miles. Management also believes that the standard deviation is 5000 miles and that tire mileage is normally distributed. To promote the new tire, Grear has offered to refund some money if the tire fails to reach 30,000 miles before the tire needs to be replaced. Specifically, for tires with a lifetime below 30,000 miles, Grear will refund a customer Si per 100 miles short of 30,000. a. Fo...
    (0)
  • $25.99
  • + learn more
BUS 660 Topic 7 Waiting Line Models - Homework Grand Canyon
  • BUS 660 Topic 7 Waiting Line Models - Homework Grand Canyon

  • Exam (elaborations) • 19 pages • 2023
  • Available in package deal
  • BUS 660 Topic 7 Waiting Line Models - Homework Grand Canyon
    (0)
  • $19.99
  • + learn more
BUS 660 Topic 1 Decision Analysis - Homework
  • BUS 660 Topic 1 Decision Analysis - Homework

  • Other • 10 pages • 2023
  • Available in package deal
  • BUS 660 Topic 1 Decision Analysis - Homework
    (0)
  • $17.49
  • + learn more
BUS 660 Topic 6 Integer Linear Programming and Advanced Optimization Applications - Homework (v2).docx
  • BUS 660 Topic 6 Integer Linear Programming and Advanced Optimization Applications - Homework (v2).docx

  • Other • 1 pages • 2023
  • Available in package deal
  • Problem 11-13: The Martin-Beck Company operates a plant in St. Louis with an annual capacity of 30,000 units. Product is shipped to regional distribution centers located in Boston, Atlanta, and Houston. Because of an anticipated increase in demand, Martin-Beck plans to increase capacity by constructing a new plant in one or more of the following cities: Detroit, Toledo, Denver, or Kansas City. The estimated annual fixed cost and the annual capacity for the four proposed plants are as follows: T...
    (0)
  • $21.99
  • + learn more