PJM Generation Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about PJM Generation? On this page you'll find 62 study documents about PJM Generation.

All 62 results

Sort by

PJM Generation Operation Exam 2024 |Questions with Complete Solutions
  • PJM Generation Operation Exam 2024 |Questions with Complete Solutions

  • Exam (elaborations) • 8 pages • 2024
  • Control center facilities must have a minimum of how many days of fuel for the backup generator? - 5 days If PJM ACE shows overgeneration, actual imports are: - Less than scheduled Who should a generator contact at PJM to clear an outage ticket? - Master Coordinator To correct for a slow or fast clock, system frequency schedules are offset by: - +/-.02 Hz What frequency would PJM set to correct for fast-time error? - 59.98Hz What frequency would PJM set to correct for slow-time error? - 60...
    (0)
  • $12.99
  • + learn more
PJM Generator Exam |Questions with Complete Solutions
  • PJM Generator Exam |Questions with Complete Solutions

  • Exam (elaborations) • 7 pages • 2024
  • The purpose of the Deploy All Resources Action is to instruct all generating resources to be on line and at full output _________ - immediately upon receipt of dispatch instruction A Heavy Load Voltage Schedule Warning has been issued for the PJM RTO. Generation Operators should: - Ensure all unit voltage regulators are in service PJM can issue the Deploy All Resources Action for________ - the entire RTO, specific Control Zones or a subset of a Control Zone if transmission limitations exist...
    (0)
  • $12.99
  • + learn more
PjM - 2024 Exam| with Questions and Complete Solutions
  • PjM - 2024 Exam| with Questions and Complete Solutions

  • Exam (elaborations) • 30 pages • 2024
  • During System Restoration, what is the optimal Frequency Range? - 59.75 - 61 Hz The 500 kV system has normal bus voltages between? - 500 to 550 kV When Connecting 2 islands, the operator must match? - Voltage, Phase Angle and Frequency What are the Minimum Source Requirements-(500kV+) for a 500 kV? - 30 MW Gen/mile of energized 500 kV and 20 MW Load/mile of energized 500 kV
    (0)
  • $13.49
  • + learn more
PJM Transmission Exam Study Questions with Complete Solutions
  • PJM Transmission Exam Study Questions with Complete Solutions

  • Exam (elaborations) • 32 pages • 2024
  • During System Restoration, what is the optimal Frequency Range? - 59.75 - 61 Hz The 500 kV system has normal bus voltages between? - 500 to 550 kV When Connecting 2 islands, the operator must match? - Voltage, Phase Angle and Frequency What are the Minimum Source Requirements for a 500kV line? (Gen/mile and load/mile) - 30 MW Gen/mile of energized 500 kV and 20 MW Load/mile of energized 500 kV
    (0)
  • $13.49
  • + learn more
PjM - Designer Hacks Exam| with Questions and Complete Solutions
  • PjM - Designer Hacks Exam| with Questions and Complete Solutions

  • Exam (elaborations) • 16 pages • 2024
  • Available in package deal
  • Work plans are used as a tool in project management. Which of the following statements regarding this tool are true? Check the three that apply. A. Creating a work plan is one of the most important tasks that should be done as early as possible B. A work plan is sometimes referred to as a fee proposal C. A work plan is sometimes referred to as a fee projection D. Must be detailed enough to assign tasks to individual staff members E. The first task of a work plan is at the bottom of the sc...
    (0)
  • $12.99
  • + learn more
PjM - Designer Hacks Exam| with Questions and Complete Solutions
  • PjM - Designer Hacks Exam| with Questions and Complete Solutions

  • Exam (elaborations) • 16 pages • 2024
  • Available in package deal
  • Work plans are used as a tool in project management. Which of the following statements regarding this tool are true? Check the three that apply. A. Creating a work plan is one of the most important tasks that should be done as early as possible B. A work plan is sometimes referred to as a fee proposal C. A work plan is sometimes referred to as a fee projection D. Must be detailed enough to assign tasks to individual staff members E. The first task of a work plan is at the bottom of the sc...
    (0)
  • $12.99
  • + learn more
PjM - Designer Hacks Exam| with Questions and Complete Solutions
  • PjM - Designer Hacks Exam| with Questions and Complete Solutions

  • Exam (elaborations) • 16 pages • 2024
  • Available in package deal
  • Work plans are used as a tool in project management. Which of the following statements regarding this tool are true? Check the three that apply. A. Creating a work plan is one of the most important tasks that should be done as early as possible B. A work plan is sometimes referred to as a fee proposal C. A work plan is sometimes referred to as a fee projection D. Must be detailed enough to assign tasks to individual staff members E. The first task of a work plan is at the bottom of the sc...
    (0)
  • $12.99
  • + learn more
Ultimate PJM Generation Exam Review |  Questions & 100% Correct Answers (Verified) |  Latest Update | Grade A+
  • Ultimate PJM Generation Exam Review | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+

  • Exam (elaborations) • 3 pages • 2024
  • Available in package deal
  • What is an ISO/RTO responsible for? : -Grid operations -Reliability -Transmission service Is an ISO/RTO is independent from: : -market participants -governance structure Does an ISO/RTO posses operational authority? : Yes PJM as an RTO Functions: : - Administer tariff - Administer regional wholesale e
    (0)
  • $9.99
  • + learn more