GENERAL B CONTRACTOR LICENSE Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about GENERAL B CONTRACTOR LICENSE? On this page you'll find 8 study documents about GENERAL B CONTRACTOR LICENSE.
All 8 results
Sort by
-
General B Contractor License Exam Revised Questions and Answers / Sure A+
- Exam (elaborations) • 20 pages • 2024
-
- $14.99
- + learn more
it is better to use leveling rod than a yard stick when using a transit because the rod is - longer 
Fill dirt is measured in - cubic yards 
what backfill should be used after concrete forms have been removed? - sand 
The best type of material to set a house foundation on is: - gravel 
what doe "rough grade" refer to in excavation and grading - the grade approximately conforming 
to the finish grade 
how many days can earth from a trench be piled up against a structure? - 7
-
General B Contractor License Questions & 100% Verified Answers | Latest Update | Already Graded A+
- Exam (elaborations) • 39 pages • 2024
- Available in package deal
-
- $13.49
- + learn more
it is better to use leveling rod than a yard stick when using a transit because the rod is 
: longer 
Fill dirt is measured in 
: cubic yards 
what backfill should be used after concrete forms have been removed? 
: sand 
The best type of material to set a house foundation on is: 
: gravel 
what doe "rough grade" refer to in excavation and grading 
: the grade approximately conforming to the finish grade 
how many days can earth from a trench be piled up against a structure? 
: 7 
2 | P a g e 
...
-
General Building Contractor (B) License Questions & 100% Verified Answers | Latest Update | Already Graded A+
- Exam (elaborations) • 23 pages • 2024
- Available in package deal
-
- $10.49
- + learn more
To whom should a stop notice be delivered? 
: The construction lender or awarding authority. 
What are the 3 ways that a stop notice can be delivered? 
: (1) In person 
(2) Registered mail 
(3) Certified mail 
Notice of Completion 
: A notice that shortens the lien period to 30 days for a subcontractor and 60 days 
for a contractor. The clock starts on the filing date of the Notice. 
notice of nonresponsibility 
: A notice provided by law designed to relieve the property owner from 
responsibi...
-
General contractor Questions & 100% Verified Answers | Latest Update | Already Graded A+
- Exam (elaborations) • 38 pages • 2024
-
- $12.89
- + learn more
In a post tensioned Beam what is the minimum size bar used to support the beam? 
: #4 Bar 
What is the minimum height between finished floor and joist in the kitchen is 48" on 
center? 
: 7 FT 
How thick does a load bearing masonry need to be on a single story building? 
: 6 inches 
What chemical is used for high heat concrete 
: retarder 
when mechanical equipment is on the roof, how far from the edge of the roof should a 
warning line be if the equipment is running parallel to the roof edge...
-
General Contractor's License Exam Questions & 100% Verified Answers | Latest Update | Already Graded A+
- Exam (elaborations) • 35 pages • 2024
-
- $12.49
- + learn more
Minnesota requires that all builders continue their education by attending 7 hours of 
classroom study per year, with at least 1 hour dedicated to: 
: Energy efficiency 
It is a law that you must notify, in writing, if you change your business name or your 
address where you conduct business, within 
: 15 days 
Penalties for violation of laws relating to the residential building industry include 
: 1. Civil penalties up to $10,000, per violation 
2. Denial of a license at application or renewa...
-
General B Contractors License Questions & 100% Verified Answers | Latest Update | Already Graded A+
- Exam (elaborations) • 6 pages • 2024
- Available in package deal
-
- $10.39
- + learn more
It is better to use a leveling rod than a yard stick when using a transit beacause the rod 
is: 
: Longer 
:Fill dirt is measured in: 
: Cubic yards 
What backfill should be used after concrete forms have been removed? 
: Sand 
The best type of material to set a house foundation on is: 
: Gravel 
What does "rough grade" refer to in excavation and grading? 
: The grade approximately conforming to the finished grade 
How many days can earth from a trench be piled up against a structure? 
: 7 
2...
-
GENERAL B CONTRACTOR LICENSE EXAM 2024 WITH 100% CORRECT ANSWERS
- Exam (elaborations) • 22 pages • 2024
-
- $14.49
- + learn more
it is better to use leveling rod than a yard stick when using a transit because the rod is - correct answer longer 
 
Fill dirt is measured in - correct answer cubic yards 
 
what backfill should be used after concrete forms have been removed? - correct answer sand 
 
The best type of material to set a house foundation on is: - correct answer gravel 
 
what doe "rough grade" refer to in excavation and grading - correct answer the grade approximately conforming to the finish grade 
 
...
-
GENERAL B CONTRACTOR LICENSE EXAM 2024 WITH 100% CORRECT ANSWERS
- Exam (elaborations) • 22 pages • 2024
-
- $16.49
- + learn more
it is better to use leveling rod than a yard stick when using a transit because the rod is - correct answer longer 
 
Fill dirt is measured in - correct answer cubic yards 
 
what backfill should be used after concrete forms have been removed? - correct answer sand 
 
The best type of material to set a house foundation on is: - correct answer gravel 
 
what doe "rough grade" refer to in excavation and grading - correct answer the grade approximately conforming to the finish grade 
 
...